Office building (:star:The Design Phase (Final architecural proposal,…
Office building
:star:
The Design Phase
Final architecural proposal
Structural proposal
Brief design proposal
Cost estimation
Agreement and documentation for choice of materials
Energy design
Soil test works
Permits
:star:
The Construction Phase
All Super structure
Building process for each floor
Putting up the column and wall elements (PEIKKO)
Putting up the beam elements (PEIKKO)
Putting up the slab elements (PEIKKO)
Putting up and casting the fugue reinforcement
All Sub strucutre
Excavation to needed level
Terrain flattening
Hammering down the piles
Installations and services access to the building
Setting up temporary retaining walls
Pumping the water out
Casting the Pad/Foot Foundation
Putting up the foundation reinforcement
Putting up the foundation formwork
External basement walls
Putting up the reinforcement
Putting up the formwork
Casting
Installations and services
Electricity
Water supply
Sewage
Heating
Ventilation
Lights
Preparing the site
Leveling
Demolition of existing building or flora
Crane set up
Putting all needed containers
Fencing the site
Temporary living spaces + offices
Creating a site plan
Land drainage
Delivery
:star:
The Tender Phase
Calculation for machinary, manpower, time frame, etc.
Tender day (bidding)
Choosing contractors
Manpower
Machinery
Supply
:star:
The Operation Phase
Quality control
Maintanence