Please enable JavaScript.
Coggle requires JavaScript to display documents.
Rail-less Concept (Concealed guide to rail system (3 stage system:…
Rail-less Concept
Concealed guide to rail system
3 stage system:
Delivery mode
Assembly mode
Ramp Mode
Removal of guide through back of rail system
Attachment of rails to Shell/ Serviceability
To be from envelope opening
End pin toggle attachment
Fixture attachment front end accessible from envelope opening
Locking System
Front End locking mech.
beneficial from an Anti rattle aspect
Rear end locking mech.
Front end to be retrained via flap mech.
Flap Locking System
interaction between flap and rails?
Incorporate existing flap rivet
centre locking latch
Tolerance relief
Take tolerance up between Guide to Rail
Tolerance taken between ramp to guide
Assembly Time
Attaching rails (alignment and fixture)
Ramp attachment (to carriages)
Ramp Ejection