PKM Mine Engineering
DNB
-
Wall Control
-
Pre-split trials on Stage 9 (1.2m, 1.4m, 1.6m, 1.8m Spacing)
-
Blast Parameters
-
Recent Parameters Used
-
Stage 9
PF 0.2 on Northeast
-Risk Assessment (Mining in close proximity to Namsan) on iShare
-Need to check lithology and adjust parameters
-
-
-
-
DESIGN
-
Pre-split parameters to be used in transition angles in pit design to be confirmed with Mine Planning Supt. and Geotech Supt.