Please enable JavaScript.
Coggle requires JavaScript to display documents.
mintwood order of construction, Costs - Coggle Diagram
mintwood order of construction
Foundations
calculate the depth, size and number of tyres used to support the container pool and stilts.
mark the location, of every tyre with a stick.
dig every hole in preperations for tyres
place tyres into the holes
fill every tyre fully with stones
2, Container pool
Transport the container to the site
Place the countainer on the tyre foundations
reinforce the container to be able to hold the water
seal the container, to be totally water proof / drilling all holes for pipes to and from pumps etc
Costs
container pool
cost of container
cost of transport of container to site
cost of placement of container on foundations
foundations.
transport costs of tyres
cost of stones.