Please enable JavaScript.
Coggle requires JavaScript to display documents.
Tutorial - 07.12.2020 - Coggle Diagram
Tutorial - 07.12.2020
Location
Where? (Geoserver)
The Perimeter of the Area & Site Explanation
The positioning of each facility? (Cad - 3D Options)
(Refer to Australia Hall Merged Photos)
Rock
Excavation - approx 7.5m (theatre) - 10m (3 levels of underground parking)
Location of the Water Table?
Site is located approx 50m above sea level
Rock Stratum Type (Geological Maps)
Proposed Project
What are we proposing?
Theatre
Dorms
School
Underground Parking
Exhibition Space
Cafeteria
Open Space
Refer for Google Docs (Preliminary Areas & Quantities) - Design Brief
Concept
Fine Arts' importance
Why are we proposing such a project?
Do we have enough facilities?
Are the facilities present adequate?
Taught / Practiced / Exhibited
Types of Arts (Coggle - Arts)
Pillars
Education
Sustainability