Time Consuming Steps (6% or more of project timeline)
Drilling
drilling the pilot hole
Installing surface casing
Reaming
30" Pass
48" Pass
54" Pass
60" pass
Drilling Mud
Disposal
Mixing
Dumping and Reworking
Testing
Hydrostatic testing
Pigging
Pressure testing
Drilling mud testing
Preparation
Clearing the area
Welding
Coating
Access and Drill Pad Preparation
Reparation
Planting Trees
Re-seeding the Ground
Ensuring wildlife returns