Work Breakdown Structure
Site Preparation
Setting out
Securing the site
Groundwork
Leveling
Excavation
Laying foundation
Backfill
Water & Sewer
Setting pipes
Structural
Frames and Columns (floor by floor)
Slabs (floor by floor)
Walls - Masonry & Plastering (floor by floor)
Doors and Windows (floor by floor)
Removal of foam-work
Removal of foam-work
Roof
Slab
Finish
Treatment / Insulation
Parapet
Rainwater channels
Mechanical Electrical Plumbing
H.V.A.C
Floor by floor
Electrical
Floor by floor
Exteriors, Circulation & Landscape
Plumbing
Floor by floor
Finishes
Interior
Painting
Fixtures
Flooring
Exterior
Cladding
Painting
Landscaping