Please enable JavaScript.
Coggle requires JavaScript to display documents.
PUB, Code of Practice on Surface Water Drainage, Code of Practice on…
PUB
Drainage
ABC Design Guidelines
Stormwater Management
Greywater Management
Rainwater Management
Exemptions & Special Requirements
Simplified Submission Classification
Temporary Sanitary Facilities for Construction Site
Minor Works Classification
Temporary Sanitary Facilities for Trade Fairs
Water Supply
Handbook on Application for Water Supply
Turn on date and procedure
Sewerage
Used Water Submission Procedures
Code of Practice on Surface Water Drainage
Minimum Platform Level
Peak Runoff Reduction
Use of Drainage Reserve
Submission Requirements
TOP stage
CSC Stage
DP Stage
Maintenance
DC Stage
Drainage Reserve Requirements
Crest Level
Flood Protection Measures
Code of Practice on Sewerage and Sanitary Works
Planning for Development Works
Sewer Works Provision
Structure Over Sewer
Setback Distance
Requirements for Trade Effluent into Public Sewer
Sewer Protection
Public Sewer Corridor
Sanitary System Design
Floor Trap and Floor Waste
Position of Sanitary pipes
Inspection Chamber
Connection to Public Sewer
Sewerage System Design
Design Criteria
Min. size of Sewer