D365 CE
Project Services
Configuration
- Set up time units
D365 Docs
- Set up Currencies
& Exchange Rates
- Configure Price Lists
Context = "Cost"
- Create Organisational Units
Specify Currency
- Configure
Transaction
Category
- Configure
Expense Category
Resources
Resource Skills
Resource Types
Set Proficiency
- Set up Invoice
Frequency
- Resource Roles
- Resource Skills
- Work Hour Templates
Generic
Contact
User
Equipment
Account
Crew
Timezones
Set on Project
Parameters
Set the one from the
"Generic Resource"
Specify Cost for
each Role
Integration
Logic Apps
VSTS Connector
Jira Connector
MS Project
Add-in
Scheduling Board
Project
WBS
Resource
Utilization
Report
Resource Utilization shows
what has happened in the past.
I.e. approved time entries
Target Utilization must
be set for a resource
Project Contract must exist
and have a Time and Material line
Role is to be Chargeable and
thus billing type must be
Chargeable at time entry approval
Default role must be set for a resource.
This is mandatory for both D365 as well
as for the PowerBI solution templates
Project Estimates
Basic
Concepts
Organisational Unit
DEFINITION: A Project Service Automation organizational unit is a group or division in a professional services company that employs billable resources with cost rates that are distinct from other such groups or divisions in the company
COST PRICES: Only "Price List" with the concept of "Cost" and same Currency as the default Currency of the Organizational Unit
Ex: Standard Cost Per Hrs
Ex2: Standard Cost Per Day
Ex3: NFP Cost Per Hrs
CURRENCY: Default Currency for this Organizational Unit
Time Entry
Project Contract
Financial Data
T&M vs Fixed Price
Drives invoicing
Important Fields
Delivery Date
Invoice Frequency
Billing Start Date
Order Line
Billing Method
Components
Project
Project Contract Line Details
Import from BWS
Resource Roles
Target Utilization
Billing Type
Skills / Certifications
%
Chargeable
Non Chargeable
Complimentary
Not Available
Range (Min - Max)
Define Labels
Opportunity
Quote
Quote Line
Quote Line Details
- Set Organisational Unit
(Affects cost of resources which are stored on the Org. Unit)
- Set Default Calendar (Affects working hours and days when creating project tasks / plan)
Roles on Tasks
Generate Project Team
Create Resource Requirements
Each Res. Req. contains a Requirement Details where you can change the "Pattern" specific hours on the day the you need the resource form
Copy from Project Template
ignores previously set Patterns ⛔