C1.1.11.0030 REV1 M75 INSTRUMENT AIR SYSTEM Back to M75 Overall Scope…
C1.1.11.0030 REV1 M75 INSTRUMENT AIR SYSTEM
Back to M75 Overall Scope
1. PRODUCTION ENGINEERING :check:
2. MATERIAL TRACABILITY
:check:
3. PREFABRICATION
:check:
Welder Qualifications & Certs :check:
PQR :check:
Welding Procedure Specifications (WPS) :check:
Fit Up Progress :check:
Welding Progress :check:
Typical Spool Rundown Curve
Manpower Loading :check:
Nightshift Request Form :check:
Foreman Chits :Check:
4. INSPECTION
:red_cross:
5. BLAST AND PAINT
:red_cross:
8.LIFTING & INTEGRATION :red_cross:
7. OWNER ACCEPTANCE :red_cross:
RFI :red_cross:
Leak Test Certification :red_cross:
Work Completion Form (signed by all parties) :red_cross:
Technical Query Request (TQR) :red_cross:
Handover to Commissioning :red_cross:
Lifting Status :red_cross:
Fit Up Progress :red_cross:
Alighment Check Form :red_cross:
Welding Progress :red_cross:
Tripartite Inspection :red_cross:
Non-Destructive Testing :red_cross:
Tripartitle Blast & Paint Inspection :red_cross:
Blasting Specifications :red_cross:
Blasting Forms :red_cross:
Tripartite Fit-up Inspection :red_cross:
Tripartite Welding Inspection :red_cross:
Blasting Certificate :check:
Mill Certificates (MS & SUS) :check:
P&ID Drawing :check:
Material Take Off :check:
Weld Maps :check:
DRAWING REVISION
Rev.1 :red_cross:
Rev.2 :red_cross:
Rev.3 :check:
PIPING SCOPE
C1 (Orginal Scope)