Please enable JavaScript.
Coggle requires JavaScript to display documents.
Maintenance (Service Schedule (After (Download the images, Ensure camera…
Maintenance
Service Schedule
After
Download the images
Ensure camera stored properly
Everything turned off
End of shift
Clean equipment
Charge all items
Before
Check for dirt / smears
Check settings are appropriate
Check electrical connections
Items
Lens
Don't touch the lens
Storage
Turn off power before inserting / removing
Don't force the card
Watch where card is stored
Away from static
Away from high temperatures
Battery
Don't force
Check electrical connections