Total Refinery Antwerpen 2018 Turnaround (Unit 67 Platform (J6702 Train…
Total Refinery Antwerpen
2018 Turnaround
Unit 67 Platform
J6701 Train
Major overhaul: J6701-T
steam turbine
Major Overhaul: J6701-C
Centrifugal blower
Algemeen (under floor):
gland steam pipe replacement (bilfinger)
1x Auxiliary oil pump (steam driven)
3x PCV valves
J6702 Train
Major overhaul: J6702-C
Centrifugal compressor
Major overhaul: J6702-R
Gearbox
Replacement: J6702-M 18t
E-Motor
Algemeen:
John-Crane J6702-C --> Measurements
Bad actors:
Oil leaks on coupling guards
Info:
Nafto also has works in the compressor building, so we will have to share the crane
Safety mats to prevent falling objects
Grating at 6701 needs to be removed in order to work on aux oil pump and PCV's
We rented a 15t pneumatic chain-block for general use & 25t just for the motor
Unit 62 Platform
J6201 Train
Minor Overhaul: J6201-C
Centrifugal Compressor
Info:
We have a 6t pneumatic chain block for general use
Minor Overhaul: J6201-T
Steam Turbine
Unit 83 Platform
J83005 Train
Minor Overhaul: J83005-C
Barrel compressor
(with dry-gas seals)
Minor Overhaul: J83005-T
Steam Turbine
Algemeen:
2x 3-way valves and dry-gas seal filters to be checked
Bad actors:
Oil leak on coupling guard (turbine side)