Please enable JavaScript.
Coggle requires JavaScript to display documents.
Enabling (Pre-Production (Exploration Drilling, Mining Access,…
Enabling
Pre-Production
Exploration Drilling
Mining Access
Environmental Approvals
Services
Tenure
Production Drilling
Infrastructure
Power
Coal Existing metric (Y/N)
Water
Camps
Drill and Blasting
IO
Drilling
Meters
Existing Supply chain report
Captured daily
Availability
Existing Supply chain report
Captured daily
Utilisation
IO Existing Supply chain Report
Captured daily
Blasting
Loaded tonnes
Existing Supply chain report
captured daily
Blasted tonnes / available stock
Existing Supply chain report
captured daily
Coal
Loading
Iron Ore
Utilisation
existing supply chain report
captured at shift level
Availability
Existing Supply chain report
captured at shift level
Coal
Hauling
IO
Utilisation
Existing Supply chain report
Captured at Shift level
Availability
Existing Supply Chain report
Captured at shift level
Coal
Dewatering
IO
Existing WAIO THREATS
DASHBOARD
Coal
Coal existing metric (Y/N)
Dozing
Coal existing metric (Y/N)
IO (not relevant)
Location (did the dirt go to the right location)
Coal
IO
Permits
Does this overlap into pre-production?
Processing
Rate
Railing
Rate
People
Availability