Please enable JavaScript.
Coggle requires JavaScript to display documents.
KPI APM (To do: First priority on top (Power curve follow up (add more…
KPI APM
To do:
First priority on top
Under perf dection
Or Full Perf detection
Algo
Losses calculation
Average production of all turbines in the wind farm
add neighboor or group of turbine calculation
Air density
Ref values
List of variable
IEC bucket with country specific
Update braking list
TBA Event Base calculation
Manual reallocation
Interface DART / DATA
Integrate the update of calculation (write back the change and recalculate the KPIs)
quick win, is it possible to migrate the tool?
From technical point of view
From contractual point of view
Losses calculated
at the event level
Define the rule to calculate at events <10min
To document on confluence
Budget follow up
Production
Revenue calculation
Market price ingestion
Power curve follow up
add more than one power curve
Air density correction
#
#
show it
Wind rose show it
PR
Air density
filtered on main or specific
Wind direction
First fault with priority
Done
FF allocation based
on the event
IEC bucket standart
PBA (10 min data)