HDN AIP-44 Apron Expansion and Rehabilitation
Bid
4/14/18 Bid opening
3/29/18 Pre bid
3/14/18 Start bids
3/2/18 Submit to FAA for Bid Auth.
Administrative
Eng Contract Amendment
Scope of Work
Prepare during Feb
MALSF Design?
CM
QA Scope
Future DBE program/goal?
Fees
Wait until phasing is determined
Is an IFE required?
QA fee
Coord contract
Project Planning
Develop schedule
Checklist
Funding
Federal grant application
CATEX (will MALSF require a review?)
DBE Program/Goal
Current project is covered
Future goals/program
Ex site analysis
Survey
Site visit
Process survey data
Order final survey
Pavement design
Analysis
Analyze new section
Analyze adjacent sections
Cost analysis on two sections
Discuss sections with FAA
Expansion Sections
Concrete (aircraft rated)
Asphalt (aircraft rated)
Asphalt (non-aircraft rated)
Joint
Layout
Details
Fleet mix
Rehab Sections
Whitetopping
Mill and overlay
Utility Design
Sanitary
Triturator lateral
Relocate main
Review with Town of Hayden
Sanitary details
Sanitary specs
Easements?
Water
Hydrants
Relocate main?
Review with Town of Hayden
Water details
Water specs
Easements?
Underdrain
Geotech recommendation
AC requirements
Electric
Remove service
Review with YVE
Easements
Electric
Apron lighting
GSE outlets
Road lighting
Perimeter
Wall
Structural design
Fencing
Gate
Grading
Apron grades
Road grades
Spot elevations
Safety area grading
Erosion control
Paint
SIDA
Parking positions
Coord with Airlines?
CDs/TSs
Specs
Review prelim list
Contract Docs
Confirm current
Mods to Standards
Drainage design
Engineer's Report
Outline