Motaz Plan
APV1 (MPC555)
AP1.1.1 (Valiant 1)
connectors
Laser
connector changing to the AP :black_square_for_stop: 3
check connector at the sensor :black_square_for_stop: 3
Main (at AP)
test short circuit :black_square_for_stop: 4
test voltages :black_square_for_stop: 4
test running :black_square_for_stop: 3
ADU
check connectors :black_square_for_stop: 3
current sensor
match connectors :black_square_for_stop: 3
2.Laser (sf/11)
ready :check:
batteries
need new calibration :black_square_for_stop: 2
ADU
should be running (UART TTL) :black_square_for_stop: 3
5.RSSI
not tested :red_flag: ?
6.PWM
Camera trigger
ready :check:
Servos
ready :check:
Motor
ready :check:
current sensor
suppose to be ready :black_square_for_stop:4
8.assemble
assemble after
test
Main (at AP)
test short circuit :black_square_for_stop: 4
test voltages :black_square_for_stop: 4
test running AP :black_square_for_stop: 3
test running PIC :black_square_for_stop: 3
[1] is ready :black_square_for_stop:
assembling
arrangment :black_square_for_stop:2
sleeving :black_square_for_stop:2
AP 1.0(tele2)
AP1.0
2.Laser
ready :check:
batteries
ready :check:
ADU
ready (check :black_square_for_stop: 4) :check:
5.RSSI
ready :check:
connectors
Laser
change connector at laser :black_square_for_stop: 4
current sensor
N/C :green_cross:
6.PWM
Camera trigger
ready :check:
Servos
ready :check:
Motor
ready :check:
8.assemble
leave it as it's :green_cross:
APV2 (BF)
AP2.0(valiant 2)
2.Laser sf/02
:check: ready
batteries
:check: ready
ADU
:check: ready (CAN)
5.RSSI
3 :black_square_for_stop: not ready
connectors
current sensor
3 :black_square_for_stop: assemble
3 :black_square_for_stop: match connectors
current sensor
3:red_flag: need test
6.PWM
Camera trigger
3:red_flag: not tested
Servos
:check: ready
Motor
:check: ready
8.assemble
:check: arrangement ready
:check: sleeving ready
:spiral_note_pad: NOTE: current sensor not assembled + connected
AP2.1
2.Laser (new type)
1 :red_flag: check for details
batteries
1 :red_flag: check for details
ADU
1 :red_flag: check for details
5.RSSI
1 :red_flag: check for details
current sensor
1 :red_flag: check for details
6.PWM
Camera trigger
1 :red_flag: not tested
Servos
1 :red_flag: check for details
Motor
1 :red_flag: check for details
8.assemble
:checkered_flag: future plan
connectors
current sensor
3 :black_square_for_stop: match connectors
3 :black_square_for_stop: assemble
Main (at AP)
:black_square_for_stop: test running
:black_square_for_stop: test voltages
1 :red_flag: check for details
:check: power and run test ready
Other
GS
check connectors
replace connectors
MIDG
Connectors
check boards