Plant Training - Starting Point 2017 SOPs (Physical Plant (Purpose (What…
Plant Training - Starting Point 2017 SOPs
Physical Plant
Purpose
What is the END RESULT that we want to achieve?
Pre Startup Checks
IDTU Commissioning plan
Startup Procedures
Standard Operating Procedures
Consult V2 of the SOPs
Shutdown procedures
Not described in v2 SOP. Consult 2017 TTANKS SOP
Equipment
Major Equipment
TIGER TANKS THERMAL EQUIPMENT
Mechanical
Electrical / Instrument
Instrumentation
Magnahelic
Dryer: -1 to 1 "H20
Baghouse Sheet: 0-10"H20
Packed Bed tower: 0-10"H20
2 x Baghouse/Scrubber 0-10"H20
one by baghouse 0-10"H20
Process
Operating Specifications
Reading Sheets / Logs
Pre-Requisites
Roles and Responsibilities - 2017 TTANKS SOP
Safety Equipment
PID drawings - explain