Please enable JavaScript.
Coggle requires JavaScript to display documents.
CURRENT WALL PANEL CREATION WORKFLOW (OBSERVATIONS (IMPROVEMENTS (LONG…
CURRENT WALL PANEL CREATION WORKFLOW
OBSERVATIONS
IMPROVEMENTS
LONG TERM GOALS (2S WORKFLOW OR BEYOND)
WALL PANEL FAMILIES
wall panel and nested files to be able to receive data across types
just-in-time wall panel creation
user define construction detail through graphic input
graphic interface
SHOP DRAWINGS
automate shop drawing process from within a *.rvt project file (MPC...Mitsui Panel Command!)
open all wall panel families from within a *.rvt project
create a *.rvt project file from templated shop drawing for each family
place family (or replace default family in template)
auto tag
auto dimension
save and close
Auto dimension shop drawings
SHORT TERM GOALS (FROG V)
WALL PANEL FAMILIES
scrub non-Frog V elements
automated individual stud size selection
eyedropper match opening size and location
map blocking cut lengths to stud size data set
blocking size selection
eyedropper match multiple data sets
SHOP DRAWINGS
adapt Deon's member labeling script to work for Frog V
assign values to pre-sorted schedules (framing, sheathing, connectors)
"tag all" tool for specific views
Frog V may require only front framing view
legacy XML file creation, filter & tag only furring for front & back furr views
batch PDF shop drawing sets
auto open specified shop drawing *.rvt files
PDF print "SHOPS" sheet set
save to specified folder
close files