CDA ISTOK (Distribution (Piping (Material TCC), Valves (Ball), Scheme…
CDA ISTOK
Distribution
Piping
Material TCC
Valves
Ball
Scheme
Loop
Tracing
Extension
Ability to qualify the line
Design Basis (URS)
TUM
:check: Number of consumers
:check: Pressure
:check: Consumption
:red_cross: Diversity factor
:red_cross: CDA quality
:red_cross: Oil
:red_cross: H2O
:check: Dew point
:red_cross: Operation mode (overall)
:red_cross: Operational mode for each tool
:check: Reserve / Extension 30%
:check: Layout/ Section
Room
Fire proof walls
Non slippery floor coating
Ventilation
Power
Equioment move-in path
Equipment
Compressor
Redundancy (2N+1)
Properties
Oil-free
Type (scroll ot screw)
Capacity, lpm
Pressure, 10 bar
Power, kW
Sound level
Facilities
Power
Cooiling (Air/ Water)
Air intake
Temperature
Filtration
Source (room or outdoor)
Drain
Installation
Foundation
Service/ Safety distances
1 / 1.5m
Receiver
Volume - max 900l
Quantity
Installation (indoor / outdoor)
Service/ Safety distances
1 / 1.5m
Outdoor:
Fencing
Insulation?
Equipment
Safety valves P+ 15%
Drain valves
Gauge
Dryer
Quantity
Equipment
PI
TI
Facilities
Power
Drain
Maintenance
By-pass
Redundancy
Type
Adsorber -70/-45
Installation
Filters
CDA class requirements :red_cross:
Quantity
Maintenance
Installation
Deliverables
PFD
Layout
System description
Applicable regulations