Please enable JavaScript.
Coggle requires JavaScript to display documents.
Deepwater Horizon (EVENTS (12:35am: Halliburton contractors finish…
Deepwater Horizon
PEOPLE
-
INDIVIDUAL
-
-
-
McGrath (2011), discusses how failure can something be a good thing for an organisation and how it helps an organisation grow.
WORKPLACE
WORKPLACE FACTORS
The inadequate safety procedures and management, made it easy to find loopholes in the system.
Jobs were not completed properly, which caused the explosions to occur and the leaks from the wells.
-
-
EQUIPMENT DESIGN
-
Well-stabiliser devices
-
-
Hand (2017), discusses the importance of human-machine collaboration and the different stages of collaboration.
-
MANAGEMENT
-
-
INFORMATION TRANSFER
-
-
J.H Berk and Associates (n.d.), discusses the different ways to prevent failures occur and way to analyse them.
SYSTEM PARTS
WELL
-
-
-
Hand (2017) discusses the relationships between both human and machine, and the benefits of this relationship.
-
-
HALLIBURTON
-
-
-
-
Knowledge about procedures, policies, standards and other relevant documents
J.H. Berk and Associates (n.d.), outlines the importance of failure assessments and monitoring the process.
-
SYSTEM LIFECYCLE
-
-
-
OPERATING
-
-
-
Instructions
Adhere to correct procedures outlined in the Standards, Code of Practice and other related documentation.
-
-
-
EVENTS
-
5:05pm: Loss of liquid is observed on the riser pipe, showing signs of a leak (CNN 2010)
-
5pm-7pm: Pressure test is completed and come back negative. Indicating leaks are evident. The indication of a build-up of natural gas is also observed (CNN 2010)
-
-
9:10pm: the well pump is stopped for testing. The pressure increases and the well continues to leak (CNN 2010)
-
9:50pm: The build up of gas is released from the well. Liquid overflows onto ship and first explosion occurs (CNN 2010)
-
-
-
-
Refereences
-
-
-
Brice, C, Evans, T, Robins, A, Sheehan J 2017, Bin Chickens: Deepwater Horizon Incident Report, AINV11001: Real World Investigation, CQUniversity, http://moodle.cqu.edu.au/
Evans, T 2017, Task 6: TA3 People, Workplace and Management, AINV11002: Socio-Technical Systems, CQUniversity, http://moodle.cqu.edu.au/
-
-
-
-
-
-
-