CHEW (2012) - FACTORS AFFECTING TIME PERFORMANCE OF REFURBISHMENT…
CHEW (2012) -
FACTORS AFFECTING TIME PERFORMANCE OF REFURBISHMENT PROJECTS IN SINGAPORE
CHAPTER 4 - RESEARCH METHODOLOGY
4.0 INTRODUCTION
The main objectives of this chapter are as follows:
to discuss the method of data collection used
to discuss the data collection process
to describe the statistical techniques used for data analysis
4.2 METHOD OF DATA COLLECTION
4.2.1 REVIEW OF RESEARCH METHODS ADOPTED IN OTHER RELATED STUDIES
4.2.2 METHOD ADOPTED IN THIS RESEARCH
4.3 THEORETICAL FRAMEWORK
4.4 RESEARCH DESIGN
4.1.1 STAGE ONE - LITERATURE REVIEW
4.4.2 STAGE TWO - SEMI-STRUCTURED INTERVIEW
4.4.3 STAGE THREE - FINAL SURVEY QUESTIONNAIRE
4.5 THE STRUCTURE OF THE QUESTIONNAIRE
4.6 PRIMARY DATA COLLECTION
4.7 IDENTIFICATION OF RESEARCH POPULATION AND CRITERIA FOR SELECTING RESPONDENTS
4.8 REFURBISHMENT PROJECT PARAMETERS IN THE QUESTIONNAIRE SURVEY
4.9 DATA TRANSFORMATION
4.9.1 FREQUENCY DISTRIBUTION AND DESCRIPTIVE STATISTICS
4.9.2 BI-VARIATE ANALYSIS
4.9.3 THE GENERAL REGRESSION MODEL
4.10 SUMMARY
4.1 RESEARCH PROCESS
CHAPTER 5 - RESEARCH FINDINGS: DESCRIPTIVE ANALYSES
5.0 INTRODUCTION
5.1 FINAL DATA COLLECTION FOR TIME PERFORMANCE OF REFURBISHMENT PROJECTS
5.2 TIME PERFORMANCE OF REFURBISHMENT PROJECTS IN SINGAPORE
5.2.1 FINANCE RELATED FACTORS
5.2.2 CONTRACTOR RELATED FACTORS
5.2.3 DESIGNER RELATED FACTORS
5.2.4 CLIENT STTRIBUTES
5.2.5 CONTRACTUAL RELATIONSHIP RELATED FACTORS
5.2.6 SKILLED LABOR RELATED FACTORS
5.2.7 MATERIAL RELATED FACTORS
5.2.8 PROJECT OR SITE RELATED FACTORS
5.2.9 UNPREDICTABLE WEATHER CONDITION
5.3 SIGNIFICANT FACTORS AFFECTING TIME PERFORMANCE OF REFURBISHMENT PROJECTS IN SINGAPORE
5.4 CURRENT LEVEL OF TIME PERFORMANCE FOR REFURBISHMENT PROJECTS IN SINGAPORE
5.5 SUMMARY
CHAPTER 6 - DEVELOPING A PREDICTION MODEL FOR TIME PERFORMANCE OF REFURBISHMENT PROJECTS IN SINGAPORE
6.0 INTRODUCTION
6.1 CORRELATION ANALYSIS
6.1.1 NON-PAYMENT OF SALARY TO WORKERS CAUSING SLOW DOWN
6.1.2 CONFLICT OR DISPUTES BETWEEN CONTRACTOR AND SUPERINTENDING OFFICER
6.1.3 UNCERTAINTY AN COMPLEXITY OF THE PROJECT
6.2 DISCUSSION ON REGRESSION MODEL OF REFURBISHMENT PROJECTS
6.2.1 THE VALIDITY OF REGRESSION MODELS
6.3 SUMMARY