Current Engineering Projects
Production
Bottle printing
28 up jig
Fix the 28 up bottle holder... This has been fixed and is now being built by SMP Lead time less than two weeks from 6/28
Bottle spinning Jig
Dispensers
Fixing up Circuits a little ....Nick and I will work on this
Clean Mini Spool Valve
Brian still has our mini spool valve
Just got it in now we just need to test with fluid
Grounding scales
First need to validate that the machine is better off with the grounded scale. Once this is confirmed we will start to install ground on all scales.
Build new dispenser
Fluid line dilivery
Changeover from 3/8 ID and 1/4 ID to all 1/4 ID
Calibrate the flow rates in the config file to what we are actually seeing when we dispense at a spacific pressure. We want to achieve a flow rate of
3rd 10 gallon pressure pot...
Consider how to make it easier to change over bags
Replace Pressure gauge
Getting all mini spool valves on the same 4 up holder...Nick took care of this ,did a great job
All machines with a Mini spool valve holder that works along with a tip holder that works.
installing flyback diode on all our solenoids
Getting cameras mounted to the back wall instead of on the scale...Task given to Kevin
RFID log in on machines
Shipping station
Cleaning up scanning...Kevin is working on
Getting it running well.. Alex and Kevin got this working well.
Bottle and Brush holder....Nick and Kevin are working on this
Handyman stuff
Noise reduction for the air compressor
Build noise reduction box
Install door
Caulking in cracks
Fixing up ethernet lines to look better.
Take out the old bottle cleaning device
Code stuff
Controlling GUI from controller
Done now we are just validating
Machine learning code
Tech stuff
Shipping station printer
Conference room printer setup with google print
noise cancel box for air compressor