Cementing Unit Access (Split Pump Skid : (Structural mods to base frame to…
Cementing Unit Access
Split Pump Skid :
-
-
-
Option to build whole new baseframe onshore, and ship offshore to reduce offshore costs
Not clear where to split skid. What is clearance needed to drill pipe? Could affect skid frame integrity
Move Pump Permanently
-
-
All tie-ins to be remade - New piping connections, new cabling, new controls cable
Assuming that hazardous areas are not affected. No new F&G, etc...
-
New Pump
-
If same size, no better than permanent relocation.
If new unit could be smaller size, better for layout
-
-
Still have issues of how to jack up / lift current skids, and roll to suitable laydown area for crane access - area looks tight
Move Pump Temporarily
-
Assume that connections can be remade. Just erection materials needed. (Gaskets, bolts, glands etc...)
Desk strengthening to lift, move and new laydown area
-
Piping connections to be remade, E&I, HVAC. How heavy is skid - risk of piping spools not aligning when reconnecting? Might be chiksan