M&CS - Asset Lifecycle
Asset Planning
SCADA requirements
Set levels
Alarms
IT Arcitecture
Power source
supply type
Lighting circuit
correct operatiing times
ensure council wont turn it off
backup supply
Standard Design
Solar System
Sunlight requirements
obstruction prevention
Operate
Comms Network
Servers
Internet failure
Electrical failure
Server Failure
Field staff
Mobile phones
Duty operators
Alarm understanding
Alarms
Electrical Network
Configuration checks
set pressures
alarm levels
Build/Acquire
Electrical Certification
Calibration
Installation
Flow monitor
Pressure monitor
Maintain
Defects
Display failure
Battery
End of useful life
failure to hold charge
protection system failure
Power Supply
Solar
Solar obsecured
solar dirty
low sunlight
Lighting Circuit
Low operating times
Fixed Circuit
Charge controller
Modem
loss of reception
Aerial failure
Incorrect alarm levels
Electrical fault
Tripped circuit breaker
Power spike
Hardware failure
Flow meter
No working
Inaccurate data
stray current
Pressure Transmitter
Stray current
Component failure
RTU (remote terminal unit)
Failure
Software glitch (restart require)
Switch failure
Scheduled Maintenace
Solar System
Clean panels
Cabinet
Electrical Certification on maintenance staff
Switch checks
Opso
Proximity
Spares availability
Renew/Dispose
Run to failure?
Analysis
Alarm monitoring
defect monitoring