1.0 ERP.SS
1.5 System construction & Releases
1.5.5 System Test
1.5.5.1 Choose a tool to build the system interface
1.5.5.3 Testing information systems
1.5.5.4 Fix the errors
1.5.5.5 Write a test case as required
1.5.5.2 Check Modules of the System
1.5.8 Convert data from legacy to new system
1.5.1 Installed Database for System
1.5.4 Write user guide document
1.5.2 Choose program tools to build modules
1.5.3 Choose a tool to build the system interface
1.5.6 Install hardware as the basis for the system
1.5.7 Software Installation
1.3 Project Plan
1.3.5 Establish budget & control
1.3.1 Project Scope
1.3.1.3 Identify budget
1.3.1.2 Identify time complete
1.3.1.1 Identify Resource
1.3.4 Detail Estimate
1.3.4.1 Estimate cost per works
1.3.4.2 Estimate time per works
1.3.4.3 Estimate all resource for the project
1.3.3 Establish project team
1.3.3.1 Assigning tasks to project team
1.3.3.2 Establish project schedule
1.3.6 Analysis risks
1.3.6.2 Analyze Business Risk
1.3.6.3 Analyze Technical Risk
1.3.6.1 Analyze Project Risk
1.3.6.4 Draw Risk Table
1.3.2 Develop WBS
1.6 Maintenance & Support
1.6.3 Training user
1.6.3.1 Scheduling
1.6.3.2 Training for Sales department
1.6.3.6 Training for Manufacturing & Warehousing department
1.6.3.4 Training for Accounting department
1.6.3.7Training for IT department
1.6.3.5 Training for Construction Management department
1.6.5 Upgrade program when new version is available.
1.6.1 Detect errors and defects of the IS
1.6.2 Improve and edit information systems.
1.6.4 Guarantee the system.
1.7 Project management
1.7.4 Update plans for the project
1.7.1 Checking the scope
1.7.2 Checking Quality of System
1.7.3 Checking Security of System
1.1 Project preparation
1.1.2 Problem Regconization
1.1.2.1 Learn the basic elements (organization, culture, character, people)
1.1.2.3 Analyze Information
1.1.2.4 Set the focus issues that need to be addressed
1.1.2.2 Gather system details (processing functions, constraints, basic interfaces, operations)
1.1.1 Define business objective
1.1.3 Identify stakeholders
1.1.4 Preliminary Estimates
1.1.6.1 Estimates Cost
1.1.6.2 Estimates Time
1.2 Business Analysis
1.2.2 Analysis of business process
1.2.2.1 Check the steps in the process
1.2.2.2 Detecting a hole in process
1.2.2.4 Document issue in process
1.2.2.3 Fix the hole
1.2.2.5 Draw Business Flow Diagram
1.2.2.6 Draw Data Flow Diagram
1.2.1 Analysis Market
1.2.1.1 Analyze Trends
1.2.1.2 Analyze the position of the business
1.2.1.3 Suggest new business trends
1.2.3 Analysis of IT application status
1.2.3.1 Identify the software in use
1.2.3.2 Identify requirement IT
1.2.3.3 Proposed IT solution
1.4 System architecture & Design
1.4.2 Detailed Design
1.4.2.1 Design Database
1.4.2.2 Design queries, procedures, functions
1.4.2.3 Design interface program
1.4.2.4 Design Functional of the program
1.4.2.5 Design Report
1.4.2.6 Design controls in the form of notifications, alerts, or errors
1.4.3 Software Design
1.4.3.3 Updating Accounting Module
1.4.3.4 Design Project Module
1.4.3.1 Updating Sale Module
1.4.3.5 Design Warehouse Module with Barcode Integrate
1.4.3.6 Design Documentation Module
1.4.3.2 Design CRM Module
1.4.3.7 Design Schedule Module
1.4.3.8 Design Mail Module
1.4.1 Outline system architecture model