Install sprinkler system ground level
Install Sprinkler system in Canopy
Touch up Fire Proof
Install Soffit 's insulated panels
Install insulated panels on column line A
Install lights in Canopy
Touch up Fire Proof
Install dry wall ceiling
paint walls and ceiling final
install blinds
Install grills
laminate floors
Finalize pot lights
Install Mesh and doors ground level
Install checker plates ground level
OSS connections ground level
Bring all sprinkler material inside the building
Install Insulated panels on line 5
Fire Stop Slab edge line 5
Install Storage units level 2
Install Storage units level 3
Install Storage units level 4
Install Sprinkler system level 2
Touch up fire proof level 2
Install Mesh and doors level 2
OSS connections level 2
Cut Mesh for lights and install hinges
Install Sprinkler system level 3
Touch up fire proof level 3
Install Mesh and doors level 3
OSS connections level 3
Cut Mesh for lights and install hinges
Install Sprinkler System Level 4
Touch up fire proof Level 4
Install Mesh and doors level 4
OSS Connections level 4
Cut Mesh for lights and install hinges
final Clean up
Seal Saw Cuts
Storage units deficiencies
Foundation insulation Weather permitting
Swales
Pond
Landscape
Caulk Sliding Door
Seal Cones on roof
Fire Stop around columns and walls in loading dock
Fire Stop Stair 2 ground level
Fire Stop Mechanical room ground level
Spray Foam around door Jambs
Spray Foam level 4 north wall
Paint Bollards front of Scissors lift
Paint Columns level 4
Finalize Furnace
Caulk all interior Windows
Install Privacy screen
Install Corner Guard for sliding door
Caulk all interior and exterior doors
Install accessories on all OH doors
Install angle for fire Shutter
Grout elevator sills and drains
Install the support for the keypad in the loading dock
Install threshold for the elevator doors
Install PVC pipes
Replace hood for sliding door
Finalize intumescent paint
Install cap flashing
Install membrane for walkway
Install remaining of Mill work
Install countertops
Modify Mill work in Kitchen
Install Mechanical fixtures
paint walls
Paint doors
Install electrical fixtures
Install equipment in video storage
install electrical fixtures in reception desk
Connect controls for the loading dock overhead doors
TSSA Permit for Elevator
Install glass for reception window
Install hardware for doors
Install door for loading dock entrance
Fire proof underside beams in elevator room
Paint door Jambs weather permitting