Please enable JavaScript.
Coggle requires JavaScript to display documents.
Pull Shop Floor Control (Push vs. pull (Comparing push and pull…
Pull Shop Floor Control
Push vs. pull
Push system
schedule release of work based on information from outside the system, i.e. actual or forecasted demand
-
control release rate, observe WIP level
-
Pull system
authorize release of work based on information from inside the system, i.e. system status
-
control WIP level, observe throughput
-
-
Comparing push and pull
Observability
WIP is directly observable, while throughput is not
-
-
-
-
-
-