THE KEY RISK MANAGEMENT FEATURES OF THE SAFETY CASE REGIME (Risk…
THE KEY RISK MANAGEMENT FEATURES OF THE SAFETY CASE REGIME
Hazard & Major Incident Identification
Hazard / Related to Major Hazard Facilities(MHF)
All activities, procedure, plant, process, substance, situation or other circumstances that cause the hazard
The nature of hazard
The Likelihood occurrence of hazard
The severity of hazard
Take in consideration the advice and recommendations from the regulatory(Work Safety Victoria)
Major Incident/Related to MHF
Once the major incident occurred, the severity of its potential health and safety consequences.
The nature of major incident
An uncontrolled incident, including an emission, loss of containment, escape, fire, explosion or release of energy
Each Major incident should be explained in detail in the operation
Safety Assessment
The nature of each hazard and major incident
In the event of a major incident occurring
Its potential magnitude
The severity of the event consequences to persons
The likelihood of each hazard causing a major incident
Consideration of the range of risk control measures
Risk Control
Any system, procedure, process, device or other means of eliminating, preventing, reducing or mitigating the risk of major incidents at an MHF.
Physical Equipment
Operating and Maintenance Processes
Management Processes
Process Control System
Emergency Adequate Plan
Staff Participation and their actions
Risk Information
The processes and procedures in place that are the control measures to be implemented by the operator.
The operating parameters for control measurements
Key staff and resources should be provided in case of the event failure cause the major incidents
Provided the summary of Emergency Plan
Update Safety Case