Flexible Riser replacement (Challanges (Heading control, Installation,…
Flexible Riser replacement
Project background
Existing riser exceed design life
Filed life is longer than expected riser's end life
Opportunities
Low oil-price environment
Direct contact to manufacturer
Details of scope
Owner requirement
Able to refine the design alternatives/ considerations
Results
Significant Lower manufacturer cost
shorter installation time
Achieved design assurance
Challanges
Heading control
Installation
Material Movement with limited crane capacity
Asset integrity
Project management with various parties