IM Governance (IM (Exhibits (L1 - IM & T, L2 - DDFO, L3 - SOW RDL, L4 …
IM Governance
IM
Exhibits
L1 - IM & T
L2 - DDFO
L3 - SOW RDL
L4 - ESPLIR
IM Plan
IM Philosophy / Strategy *
Master Reference Data *
Unsuccessful FEED Bidder Purge Plan
Doc Control
Document Control Procedure
Document Numbering Procedure
Document Requirements Matrix
Templates
Document cover sheet
Document Exchange Procedure *
Engineering Data
Handover Specification *
Tag Numbering Procedure
Engineering Registers
Master Tag
Anodes
Blinds
Cables
Condition Monitoring
Critical Protective Settings
Electrical Load List
Electrical Equipment
Electrical Consumers
Mechanical Equipment
Explosion Rated
Fire and Gas
Flange
Flares
Health and Safety
Heat Tracing
Helipad
HVAC Duct
HVAC Instrument
HVAC Mechanical Equipment
ICS (Connected)
ICS (Not Connected)
Installation Certificates
Instruments
Instrument Settings
Integrity Level Rating
Junction Boxes
Lifting Equipment
Lubrication Index
Manual Valve
Physical Label
Pipe Supports
Piping
Pressure Vessels
Program Controller (HW/SW)
Pressure Safety Valves
Relay Setting Index
Safe Operating Limits
Safety Related Devices Index
Single Line Connections
Soft Tags
Special Items
Special Tool List
Telecoms
Tag to Document
Trip and Alarm
Utility consumption
Vendor Certificates
Vents and Stacks
Commodity Code Register
OEM Equipment
OEM Equipment to Document
Spare Parts
Spare Parts Interchangeability
Bill of Materials
MRDL
Project Controls and Coordination
Pims User Guides
Internal
External