Please enable JavaScript.
Coggle requires JavaScript to display documents.
As far as reasonably practicable (consider following in account…
As far as reasonably practicable
Condtions should fullfilled
safety
security
minimized to the level of maximum tolerable level
reduced in cost of overall project
increase in efficiency
completion in time
cost should be within the tolerable range
Physical condtions
wok place must be safe for specific time
hazard and risk that may emerge
accessibility of important things to limit risk
specific control measures
proactive arrangement
decrease in loss for less dangers
weakening the danger
time taken into account be embraced
consider following in account
likelihood of the hazard or risk occuring
probability of the peril or risk is concerned happening
degree of harm from the hazard or risk
every risk has the capacity to harm the project therefore should analyse properly
eliminating or minimizing the hazard or risk
high level risk must be eliminated
which affect to meet the objectives of the project should be avoid
low level of risk can be isolated
risk that will not effect the project
cost of eliminating or reducing the hazard or risk
accessibility and appropriateness to dispense risk
every seen and unseen risk should be consider
challenges
cost efficiency
cost benefit analysis should be done
engineering practice
to meet the standard of design
Execution in the Project
Implications