Feasibility (Water and Discharge (what are the treatment options (Golder…
Feasibility
Water and Discharge
where is the water being drawn from
what are the treatment options
Golder to inform
How much is drawn in
Where is it being treated?
Needed for QR and Wells
Tailings will impact this
Scope 27 to be signed
Steve Jennings input
Mayana Input
Discharge
Where is the water being discharged to?
Does anything need to be upgraded at QR?
Golder to assess options
Settling Pond
Ditching
Aquatics
3 Phase Power
BC Hydro
Does this need to be included in EA?
Who is responsible?
Costing
Timeline
Kelsey to work with Hugo on this
500 Road Upgrade
All North Program
Golder needs data for EA Input
Fisheries on 500 Road water crossings
Surveying underway
Drone Survey
Wells Camp
QR Camp
Visualization
Golder or BBA to complete
Matt Carter to consult with
Scope to be signed
Lidar
Geotechnical Drilling
Exploration
SRK Program
Hydrogeology
Hatfield Report
Golder Data
Update sampling program to include all holes
rock mechanics
long-term analysis
Hy-Tech Drilling
Operations
BBA Program
Shallow holes
Based off results of test pitting
Mud Bay Drilling
Portal Location
Road Planning - Wells
9 Holes
Will need to be done in QR
Wells Road
Ditching
Direction
Highway Crossing