Please enable JavaScript.
Coggle requires JavaScript to display documents.
Zimbabwe 2018 Project Completion Plan (Victoria Falls Hospital (X-Ray Room…
Zimbabwe 2018 Project Completion Plan
Victoria Falls Hospital
X-Ray Room
Cassettes replaced
Battery replacement and recallibration
US trainee
Zimbabwean to come to US for training
Original X-Ray
Deinstall
Diagnose and repair
Optional Workstation Cart for scanner
Convert to native power and remove inverter
Blood Cooler
Replace UPS with surge suppressor
Electrical assessment and grounding of outlet
Generator issues
ICU
Equipment and Power Issues
Convert equipment to native power
US electrician to do the work
Electrician in Zim
Power inverters and strips
2 Patient monitors need mounting/stands
Ventilator
Convert power to native or alternative solution
Re-engage ICU nurse on use
Anne to assess and report why room is not being used
Lukosi Clinic
Surgical Pod
Plumbing
Ministry of Planning to hook up
LFA plumber to install knee activated sink
Pod prep.
Supplies to storage cabinets
Cleaning
Sterilizer
Biomed to test and train in use
Anesthesia Machine
Determine Viability at Lukosi
Move to Vic Falls
Biomed to set up, test
Will MOH place an anesthesiologist at Lukiosi?
Work with MOH to determine what procedures will be done
Pod SOP manual
Jeremy and MLS to create
Include maintenance and service schedule for solar system
Include AC operation
Battery Maintenance schedule
Power Assessment
Connect to grid power?
Trim tree above panels
Clinic Equipment
Incubator
Biomed to test and provide SOP
Ultrasound
Radiologist
Work with LFA,AHF and MOH
Biomed to set up
Probes unboxed and stored
Cover from dust (close windows)
Beds
Electrician to assess cost and viability of power conversion
Bedding included in next shipment
M11 Autoclave
Set up in birthing prep. room
Power
Converter or Native?
Baby Warmer
Biomed to test, fix or discard